Cell Tower & Substation Leasing
Enhance Your Wireless Network in Central Texas
Austin Energy's substations provide the optimum siting solution for the wireless industry. Located in prime locations throughout Austin, many of our substations have existing monopoles with spaces available for cellular antennas.
For more information please contact the Pole Attachment Services (PAS) Group.
Application Criteria
You must submit an application if you plan to:
- Install a new tower or attachment.
- Make modifications (any change in type, nature, or location of an attachment).
- Remove an existing attachment.
Application Process
Cell Tower Application Process
Please follow these instructions before submitting an application. Incomplete applications and applications submitted without the back-up information required below will not be accepted.
Have questions? New to the process? Contact us before you begin your application.
- Download and complete the Infrastructure Usage Application for Wireless Telecommunications (pdf).
- Provide required information:
- Provide at least two (2) recent, high-resolution photos of the proposed site
- Provide precise site location in the form of a Google Earth Pin (.kmz file)
- Provide proposed site plan and antenna pattern
- Provide structural analysis (For New or Modifications)
- Submit the completed application and additional information to Austin Energy’s IR Application below.
- At the bottom of the application, indicate if you want to receive an email confirmation.
Requesting Access to Austin Energy Substations and Secured Sites
Please follow these instructions before submitting an application.
Have questions? New to the process? Contact us before you begin your application.
- Download and complete the Austin Energy Site Access Application Form (pdf).
- Complete and submit this application to Austin Energy’s IR Application below.
- At the bottom of the application, indicate if you want to receive an email confirmation.