 |
Hold current proof of 40 hours
of PV training and have installed two
PV systems—one can be in a training environment; the
other a minimum 1kWdc grid tied. |
 |
The PV installer must have
taken a lead role in the installation of the 1kWdc
PV grid tied system. A lead role is defined as a foreman, supervisor,
or site manager responsible for the quality of the installation,
or an experienced person performing the trade without
supervision. There may be present several workers who do not carry responsibility, but who are aspiring
to a lead role. The kWdc solar installation must be
a system with a grid tied inverter and be subject to
a complete electrical permit and inspection process
by a permitting authority. |