Application
This clause is applicable to all City of Austin electric rates for which a Fuel Adjustment Clause is prescribed.

Fuel Rate
The Fuel Rate is expressed by the following formula:

   
F + I
 
(E + T) - A
Fuel Rate =

  +

   
S
   
S

In the Fuel Rate formula:

F is the estimated cost of fuels and related expenses, including refunds and the cost of purchased power for the twelve (12) month period used to calculate the FAC for service-area sales.

I is 1) the estimated fees and charges from the Electric Reliability Council of Texas (ERCOT) Independent System Operator (ISO) incurred by the City of Austin when providing energy and capacity needed to meet its service-area obligations the twelve (12) month period used to calculate the FAC and 2) the estimated cost of the ERCOT ISO Administrative Fee for twelve (12) month period used to calculate the FAC .

S is the estimated service-area sales of kWh for the twelve (12) month period used to calculate the FAC.

E is the actual cost of fuels and related expenses, including refunds and the cost of purchased power, less any fuel costs for off system sales of energy for the latest twelve (12) month period of data available.

T is 1) the actual fees and charges from the ERCOT ISO incurred by the City of Austin when providing energy and capacity needed to meet its service-area obligations and 2) the actual Administrative Fee for the latest twelve (12) month period of data available.

A is the actual cost recovered from service-area sales for for the latest twelve (12) month period of data available.

The fuel rate shall be effective January 1st, unless adjusted for over- or under-recovery.

If, at any time, there is more than a ten percent over-recovery from the total projected fuel and purchased power costs for the twelve month period used to calculate those costs, the City of Austin shall initiate a review of the FAC to project whether the over-recovery will be within ten percent for the remaining months of the twelve month period used to calculate those costs. If the review indicates an over-recovery of more than ten percent for the remainder of the period, the City of Austin shall adjust the FAC for the next twelve months to eliminate the over-recovery.

If, at any time, there is more than a ten percent projected under-recovery from the total projected fuel and purchased power costs for the twelve month period used to calculate those costs, the City of Austin will initiate a review of the FAC to project whether the under-recovery will be within ten percent for the remaining months of the twelve month period used to calculate those costs. If the review indicates an under-recovery of more than ten percent for the remainder of the period, the City of Austin may adjust the FAC for the next twelve months to eliminate the under-recovery.

Calculation
The Fuel Rate is multiplied by the following voltage level adjustment factors:

Secondary Multiplier: 1.004854
Primary Multiplier .974939
Transmission Multiplier: .964826


We make every effort to be accurate in displaying rates online. In case of conflict, the official tariffs on file with the City Clerk's office take precedence.

 
 
    Austin Energy Logo    
© 2009 Austin Energy. All rights reserved.En Español | Site Map |Privacy Statement | City of Austin | Contact Us